top of page
sunny-huntingdon-house-main-2
north west perspective
lighthouse---1
IMG_7621
IMG_3864
IMG_0536

Stage 4 - Production Information including Building Regulations

Production information including Building Regulations

A Full set of Building Regulations notes on construction methods

Drainage layouts Includes all the drainage runs, pipe dimensions

Integration of consultants and manufacturers details into the proposals where required

Detailed Vertical sections through each element of the building to establish the way in which they are connected

Spot details to Include all the construction details i.e. foundations, wall construction, floor construction, roof construction

Submission of Building Control Application

bottom of page