top of page
Stage 4 - Production Information including Building Regulations
Production information including Building Regulations
A Full set of Building Regulations notes on construction methods
Drainage layouts Includes all the drainage runs, pipe dimensions
Integration of consultants and manufacturers details into the proposals where required
Detailed Vertical sections through each element of the building to establish the way in which they are connected
Spot details to Include all the construction details i.e. foundations, wall construction, floor construction, roof construction
Submission of Building Control Application
bottom of page